Scope of Work
-
Design, Supply, Installation, Testing, and Commissioning: The primary objective was to design, supply, install, test, and commission a Single bay 33/6.6 kV outdoor switchyard located at Suryanagar and Kawadas Taluka Dahanu.
-
Contract Duration: 3 months.
The design phase for the project involving the Single bay 33/6.6 kV outdoor switchyard at Suryanagar and Kawadas Taluka Dahanu included several specific tasks:
Specific Tasks in the Design Phase
-
Site Assessment:
-
Conducted a thorough assessment of the site to understand geographical, environmental, and logistical factors that may influence the design.
-
-
Technical Specifications:
-
Developed detailed technical specifications for all components of the switchyard, including transformers, circuit breakers, and other electrical equipment.
-
-
Electrical Design:
-
Created electrical schematics that outline the configuration of the switchyard, including connections, load calculations, and protection schemes.
-
-
Civil Design:
-
Designed the civil structures required for the switchyard, including foundations, control rooms, and fencing.
-
-
Compliance and Standards:
-
Ensured that all designs comply with relevant national and international standards, as well as local regulations.
-
-
Preparation of Drawings:
-
Prepared detailed engineering drawings, including layout plans, elevation views, and installation details.
-
-
Cost Estimation:
-
Developed a comprehensive cost estimate based on the design, including materials, labor, and overheads.
-
-
Review and Approval:
-
Submitted the design documents for review and obtain necessary approvals from MMRDA and other relevant authorities.
-
-
Coordination with Stakeholders:
-
Engaged with stakeholders, including MMRDA, local authorities, and other contractors, to ensure alignment and address any concerns during the design process.
-
-
Risk Assessment:
-
Performed a risk assessment to identify potential challenges during the construction and operation phases and propose mitigation strategies.
-
These tasks were crucial for ensuring that the switchyard was designed effectively, met operational requirements, and adhered to safety and regulatory standards.