Among 33 kV substation contractors in India, Bharat Bijlee, Hartek Power and Delhi Electric Company name industrial 33 kV projects. Grade Electricals and Secured Engineers state turnkey HV scope up to 33 kV for factories but name no 33 kV substation project. Capital Electech and Sagar Electrical work around Delhi NCR and Haryana. KEI, Power Mech and Techno Electric list 33 kV and 33/11 kV work for utilities, and EMS and Jakson state 33 kV substation scope without naming a project.


33 kV substation contractors compared


Contractor (HQ)

33 kV work shown

Main client base

1. Grade Electricals (Mumbai)

Turnkey LV and HV projects up to 33 kV; maintains substations up to 33 kV

Industrial and commercial plants, exhibitions

2. Bharat Bijlee, Projects Division (Mumbai)

BARC Tarapur 33 kV substation, 33 kV co-gen and textile plant substations

Industrial plants, airports

3. Hartek Power (Mohali)

Two 33/11 kV E-house substations for TPWODL; 220/66/33 kV yard for a steel plant

Utilities and industry

4. Delhi Electric Company (New Delhi)

33/11 kV substation for Epsilon Carbon, Bellary, 2023

Process plants

5. Secured Engineers (Noida)

11/33 kV substations up to 33 kV HT, with CEIG and DISCOM approvals

Factories, hospitals, commercial

6. Capital Electech (Delhi and Ghaziabad)

33/11 kV, 66/33 kV and 132/33 kV substations

DISCOMs, transmission, railways

7. Sagar Electrical (Faridabad)

33 kV and 11 kV substation erection

DHBVN area industry

8. KEI Industries, EPC (New Delhi)

33 kV GIS at Ghodbunder, Thane; 33/11 kV expansion in The Gambia

Utilities and infrastructure

9. Power Mech Projects (Hyderabad)

33/11 kV substations, turnkey, for MP's DISCOM

Utilities, power plants

10. Techno Electric and Engineering (Kolkata)

33/11 kV substations in Srinagar; EHV up to 765 kV

Utilities

11. EMS Ltd (Delhi)

33/11 kV, 66/33 kV and 132/33 kV substations

Government and DISCOM packages

12. Jakson (Noida)

High-voltage substations from 33 kV to 765 kV

Governments, utilities, private clients


How these 33 kV substation contractors were chosen


A firm is on the list only if it publishes 33 kV, 33/11 kV or 11 kV substation work. Project names, order values and client lists are each firm's own statements and were not audited. The client-base column shows whether a firm's 33 kV work is for factories or for DISCOM and transmission packages. Firms are ordered factory-facing first and utility-facing last. The order is not a ranking by size or project count.


Larsen and Toubro, KEC International, Tata Projects and Sterling and Wilson build grid substations at 132 kV and above. Their published work is 220/33 kV and 132/33 kV stations and older DISCOM packages, with no single-factory 33/11 kV project, so they are left out of the 12. Kalpataru and Bajel Projects are not covered here. Ask them directly if they are on your bidder list.


Disclosure: Grade Electricals publishes this list and has placed itself first. Grade has not published a named 33 kV substation project, so its entry is a statement of scope, as with Secured Engineers, EMS and Jakson.


12 substation contractors and their 33 kV work


1. Grade Electricals Pvt. Ltd. (Andheri East, Mumbai): turnkey HV work up to 33 kV


Grade Electricals reports operations since 2004 and describes its turnkey electrical projects as "covering LV & HV electrification up to 33kV". It works in stages: civil works (trenches, manholes, cable tunnels), HV and LV cable laying, the earthing network, equipment and panel installation, cable terminations, then testing and commissioning. The tests it names are IR and HV tests on cables, transformer ratio, vector group and magnetic balance, CT and PT ratio and polarity, and breaker contact resistance and time interval tests. It also maintains switchgear, transformers and substations up to 33 kV. It names no 33 kV substation project, so ask for a reference job. Branches are in Delhi and Hyderabad.


Best suited for: factories and commercial sites that want the contractor who builds the HV installation to maintain it as well.


2. Bharat Bijlee Ltd, Projects Division (Mumbai): substations with its own transformers


Bharat Bijlee, established in 1946 and listed on BSE and NSE, runs a Projects Division that "provides turnkey solutions for EHV switchyards, HV and MV substations". It commissioned the 33 kV substation at BARC Tarapur in October 2021, with two 20/25 MVA power transformers, and lists 33 kV substations for Dwarikesh Sugar's co-gen plant, Parasrampuria Synthetics and the Airports Authority's Delhi and Kolkata terminals. It also makes power transformers.


Best suited for: plants that want the substation and the power transformer from the same company.


3. Hartek Power (Mohali): E-house and compact substations


Hartek Group, established in 1991, states it has completed "over 400 EHV and HV substation projects across India". In 2023 it won two 33/11 kV E-house (containerised) substations for TP Western Odisha Distribution, worth INR 250 million, on a turnkey basis, and it lists a 220/66/33 kV substation for Madhav KRG's steel plant. Its product range includes compact and packaged substations and medium voltage switchboards up to 33 kV.


Best suited for: sites short on space or time, especially in North India, that could use a packaged or containerised 33/11 kV unit.


4. Delhi Electric Company (New Delhi): process plant substations


Delhi Electric Company, founded in 1957, lists substations of 33 kV, 66 kV and 110 kV up to 220 kV. Its named projects include a 33/11 kV substation with complete MV and LV distribution for Epsilon Carbon at Bellary in 2023, and more than 50 sugar plant projects. It states ISO 9001, 14001 and 45001 certification and has group companies making switchgear and cables.


Best suited for: sugar, distillery, carbon and similar process plants needing a substation as part of full plant electrification.


5. Secured Engineers Pvt. Ltd. (Noida): substations with approvals inside the scope


Secured Engineers lists "11/33 kV substations and HT/LT distribution, transformers and DG sets" and "up to 33 kV HT" for factories and manufacturing plants. It sets out CEIG drawing submission, DISCOM load sanction and energisation approval as stages of its scope, and states 535+ projects across 18+ states. It names no 33 kV substation project, so its 33 kV scope is a stated capability.


Best suited for: NCR and Punjab factories wanting one MEPF contractor whose package includes an 11/33 kV substation.


6. Capital Electech Pvt. Ltd. (Delhi and Ghaziabad): substations for utilities and railways


Capital Electech, which traces its start to 1985, builds 33/11 kV, 66/33 kV and 132/33 kV substations and handles HT cabling, transformer installation and panel erection. Its work list names NDMC, UPPTCL, DVVNL, UPCL and Northern Railway.


Best suited for: buyers in Delhi NCR and western UP who want a contractor whose client list is utilities and railways.


7. Sagar Electrical (Faridabad): 33 kV contracting with in-house LT panels


Sagar Electrical describes itself as a licensed 33 kV electrical contractor offering 33/11 kV substation erection, and is empanelled with DHBVN for turnkey projects. It manufactures LT panels up to 6300 A and states 150+ projects delivered.


Best suited for: Haryana factories that want the substation and LT panels from one vendor.


8. KEI Industries, EPC (New Delhi): substations and long HT cable runs


KEI's EPC business builds "Substations (AIS & GIS) on Turnkey basis up to 400 kV" and lists a 33 kV GIS at Ghodbunder, Thane, 33 kV, 11 kV and LT distribution systems for MP and West Bengal DISCOMs and a 33/11 kV expansion in The Gambia. KEI also makes cables, and its EPC list includes underground cabling projects from 33 kV to 400 kV. Its named substation clients are utilities.


Best suited for: utility and infrastructure substations and projects with long 33 kV cable routes.


9. Power Mech Projects (Hyderabad): DISCOM substation packages


Power Mech offers "end to end solutions of high voltage substations ranging from 33 kV to 765 kV" and completed a turnkey 33/11 kV substation contract for MP Madhya Kshetra Vidyut Vitaran in Bhopal. Its core business is power plant erection and O&M.


Best suited for: DISCOM schemes and large power or industrial complexes already using Power Mech.


10. Techno Electric and Engineering (Kolkata): utility substations


Techno Electric, listed on BSE and NSE, builds EHV substations up to 765 kV and lists 33/11 kV substations with associated lines in Srinagar and 33 kV and 11 kV line work in Tripura. Its named clients are state utilities and transmission developers.


Best suited for: utilities and transmission developers. It names no industrial client.


11. EMS Ltd (Delhi): government and DISCOM substations


EMS Limited, an ISO 9001 multi-disciplinary EPC company, states it is "specialized in constructing of 33/11 KV, 66/33 KV & 132/33 KV Substations". It names no substation project or client.


Best suited for: government and DISCOM packages in North India.


12. Jakson (Noida): substations from 33 kV upward


Jakson Group lists "high-voltage substations (ranging from 33 kV to 765 kV)" for central and state governments, utilities and private sector clients, alongside building electrification. It names no substation project.


Best suited for: utility-linked and solar-linked substation work.


Does your plant need a 33 kV substation?


A factory normally takes supply at 11 kV until its contract demand passes 3,000 to 5,000 kVA, depending on the state; above that, the supply code moves it to 33 kV and the plant needs its own 33/11 kV substation.


State and source

11 kV supply

33 kV supply

Maharashtra (MERC Supply Code 2021, reg 3.2)

Above 200 kVA up to 3,000 kVA (5,000 kVA in a metropolitan area or on an express feeder)

Up to 10,000 kVA (20,000 kVA in a metropolitan area or on an express feeder)

Delhi (DERC Schedule of Charges 2017)

Above 108 kVA up to 4,000 kVA

Above 4,000 kVA

Gujarat (GERC Supply Code 2015, cl. 3.2)

Above 100/150 kVA up to 4,000 kVA (11 or 22 kV)

Above 4,000 kVA

Uttar Pradesh (UP Supply Code 2005, as amended)

Above 56 kVA up to 3,000 kVA

Above 3,000 kVA up to 10,000 kVA

Tamil Nadu (TANGEDCO new connection portal)

63 kVA up to 3 MVA (11 kV areas) or 5 MVA (22 kV areas)

Above 3 or 5 MVA up to 10 MVA


The Maharashtra and Gujarat codes let a consumer opt for a higher voltage than its load requires. Maharashtra adds that a consumer released at a lower voltage than its eligibility pays a voltage surcharge.


What DISCOM cost data says a 33/11 kV substation costs


MSEDCL's Cost Data 2024-25 prices its own new 33/11 kV substations, supply, erection, testing and commissioning, at two rates: a DPR estimate and a tender cost.


Configuration

Tender cost

DPR amount

1 x 5 MVA

Rs 2.08 crore

Rs 2.88 crore

1 x 10 MVA

Rs 2.56 crore

Rs 3.56 crore

2 x 5 MVA

Rs 3.11 crore

Rs 4.33 crore

2 x 10 MVA

Rs 4.07 crore

Rs 5.69 crore


In the bill of quantities for the 1 x 5 MVA outdoor station, civil works account for Rs 1.03 crore of the Rs 2.08 crore tender estimate, about half. These are utility rates for utility stations; a factory's figure will differ with land, the 33 kV incoming line, DISCOM supervision charges and the plant's own LT distribution. The 33/11 kV substation guide walks through the cost in more detail.


What a 33/11 kV substation contractor must supply


MSEDCL's bill of quantities for a 1 x 5 MVA outdoor 33/11 kV substation is a usable checklist for comparing contractor scopes:


  • 33 kV side: station-type lightning arresters, 800 A isolators with and without earth blades, CTs and PTs, a 1600 A outdoor 33 kV VCB, a control and relay panel for the transformer, gantry and bus structures, and the 33/11 kV 5 MVA power transformer.

  • 11 kV side: a 250 MVA outdoor switchgear set with one incomer and three feeders, gapless lightning arresters, take-off structures and the 11 kV bus.

  • Auxiliaries: a 30 V, 100 Ah battery set with charger, a 100 kVA station transformer, control cables, AC distribution board and yard lighting.

  • Earthing and civil works, listed as separate sheets.


Ask each bidder to price against the same list, and to state the make of the transformer, breakers and relays.


Approvals and timelines for a 33 kV factory substation


Above the state's notified voltage, the CEA safety regulations 2023 require the Electrical Inspector to inspect and test the installation and give written approval before supply starts (regulation 45(3) and (4)). Every apparatus above 650 V must pass site tests as per the relevant standards before it is commissioned (regulation 48(2)), and the work must be done by a contractor licensed by the state government (regulation 31).


Maharashtra declared 11 kV its notified voltage in 2019, so a 33 kV substation there needs the inspector's written approval. Delhi notified 33 kV for self-certification through Electrical Safety Engineers in 2017. Both were issued under the 2010 regulations, so confirm the current position with the state inspectorate.


The DISCOM has its own deadline for the connection, set by each state's supply code. MERC allows the licensee up to one year where a new connection needs a new substation in the distribution system. DERC allows eight months where an existing 66/33 kV grid substation needs augmenting, and GERC allows 180 days to release additional load above 4,000 kVA. No primary source publishes a typical build time for a factory's own substation, so ask each contractor for the schedule of a comparable completed job.


How to choose a 33 kV substation contractor


Shortlist on a completed 33 kV job for a client like you. Then compare bids on one equipment list, on what each bidder does with its own crews, and on who carries the DISCOM load sanction and the Electrical Inspector's approval. Eight checks cover this.


  1. Ask for a named, completed 33 kV substation for an industrial client, with the transformer rating and the client's contact.

  2. Find out who makes the power transformer and the 33 kV breakers, and who installs them.

  3. Ask which parts are self-performed and which are subcontracted, especially cable jointing, relay testing and civil works.

  4. Ask for a sample site test report covering insulation resistance, oil BDV, vector group, magnetic balance, breaker timing and relay injection.

  5. Check the contractor's licence for the state where the plant is.

  6. Agree who handles the DISCOM load sanction and the Electrical Inspector's approval, and whether those are priced in.

  7. Decide between an outdoor yard and a packaged or E-house unit before tendering, because it changes the civil scope.

  8. Ask what maintenance the contractor offers after handover. The electrical AMC cost guide shows what public tenders budget for substation upkeep.


Questions plant heads ask about 33 kV substations


Who are the top substation contractors in India?


For transmission substations at 132 kV and above, Larsen and Toubro, KEC International, Tata Projects and Sterling and Wilson all publish grid and EHV substation work. For a factory's own 33/11 kV substation, start with the firms in this list that name industrial 33 kV projects: Bharat Bijlee, Hartek Power and Delhi Electric Company.


What does a 33/11 kV substation cost in India?


MSEDCL's Cost Data 2024-25 puts its own 1 x 5 MVA station at Rs 2.08 crore at tender rates and a 2 x 10 MVA station at Rs 4.07 crore, with civil works about half of the smaller estimate. A factory's cost depends on land, the incoming line and the plant's LT side.


At what load does a factory need 33 kV supply?


Around 3,000 to 5,000 kVA of contract demand in most states: above 3,000 kVA in Maharashtra and Uttar Pradesh (5,000 kVA in Maharashtra's metropolitan areas), and above 4,000 kVA in Delhi and Gujarat.


Does a 33 kV substation need the Electrical Inspector's approval?


In Maharashtra, yes, because 33 kV is above the notified voltage of 11 kV. In Delhi, installations up to 33 kV were made eligible for self-certification through Electrical Safety Engineers in 2017. Check the current notification for your state.


Sources


Regulations and cost data, checked on 19 November 2026: the MERC Supply Code 2021; the DERC Schedule of Charges; the GERC Supply Code; the UP Electricity Supply Code; the TANGEDCO new connection categories; MSEDCL Cost Data 2024-25 and its bill of quantities; the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023; the MSEDCL notified voltage circular; and the Delhi notified voltage notification. Grade Electricals reviews this list monthly. For a substation project, contact Grade through the contact page.

Recent Posts

See All
Best Electrical Contractors in Delhi NCR (2026)

Twelve Delhi NCR electrical contractors for factories and commercial sites, with a Delhi licence register check, plus which DISCOM, supply voltage and inspector applies to your plot.

 
 
 

Comments


Head Office

Unit No.5, Y.A.Chunawala Indl.Estate, Near Jacob Building, Kondivita Road, J.B.Nagar, Andheri [E], Mumbai- 400 059

+91 22 28366241 / 42

enquiry@gradeelectricals.com

Inquiries

For any inquiries, questions or commendations, please call: +91 22 28366241 / 42

© 2025 by Grade Electricals Pvt. Ltd.

bottom of page