An HT (high tension) panel receives, switches, meters and protects the incoming supply at 11, 22 or 33 kV, before the transformer. An LT (low tension) panel takes the transformer's 415 V output and distributes it to motors, machines and distribution boards. Maharashtra's supply code draws the legal line between HT and LT at 650 V, while the switchgear standards split at 1,000 V: IS/IEC 62271-200 governs HT panels and IS/IEC 61439 governs LT panels.


Difference between an HT panel and an LT panel


HT and LT panel compared on voltage, standard, breaker type, tests and approval:


Aspect

HT panel

LT panel

Voltage band (Maharashtra supply code)

650 V up to 33,000 V

Below 650 V

Typical system voltage

11, 22 or 33 kV, with equipment rated 12, 24 or 36 kV

415 V, with assemblies rated up to 1,000 V AC

Position in a factory

Between the utility's metering cubicle and the transformer

After the transformer, feeding the plant's loads

Governing standard

IS/IEC 62271-200:2021, breakers to IS/IEC 62271-100:2021

IS/IEC 61439-1 and 61439-2:2020, breakers to IS/IEC 60947-2:2016

Breaker type

Vacuum (VCB) or SF6, or an SF6 ring main unit

Air circuit breaker (ACB), MCCB, fuse-switch feeders

Internal design classification

Loss of service continuity (LSC) and internal arc class (IAC)

Forms of internal separation, Form 1 to Form 4b

One-minute power-frequency test

28 kV for 11 kV, 50 kV for 22 kV, 70 kV for 33 kV equipment

Lower values, set by IS/IEC 61439-1

Approval before charging

Self-certification up to the state's notified voltage (11 kV in Maharashtra), Electrical Inspector approval above it

Self-certification by the owner


Where the legal line between HT and LT sits


For a consumer, the definition of HT comes from the state's supply code. Maharashtra's MERC Supply Code 2021 defines High Tension as "all voltages above and including 650 Volt and up to and including 33,000 Volts", Low Tension as "all voltages below 650 Volt", and everything above 33,000 V as Extra High Tension. Delhi's code draws it differently: DERC's 2017 Supply Code declares 11 kV as HT and 33 kV or 66 kV as Extra High Tension (regulation 4(2)).


The CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 contain no definition of low, medium, high or extra-high voltage. They split their rules by number instead: Chapter V covers installations "not exceeding 650 V" and Chapter VI covers those "exceeding 650 V". Regulation 39 adds extra conditions above 250 V.


The switchgear standards use a third boundary. IS/IEC 61439-2 covers assemblies rated up to 1,000 V AC, and IS/IEC 62271-200 covers switchgear above 1 kV and up to 52 kV. A 690 V motor board falls between the three: it is HT under the Maharashtra supply code and falls under the CEA's above-650 V chapter, yet it is built and tested as an LV assembly under IS/IEC 61439.


The MERC code also sets the load at which a factory moves to HT supply. In the 2021 text, a single consumer above 160 kW or 200 kVA of contract demand is supplied at 11 kV (regulation 3.2), and at 11 kV the consumer must provide its own circuit breaker. The HT vs LT connection guide for Maharashtra covers the supply side: tariff, contract demand and the application.


Where the HT panel and LT panel sit in a factory


From the utility's line to a machine there are six stages. The MERC supply code fixes the point of supply, and CEA regulation 37 sets the minimum switching device at most of the others:


  1. Utility metering cubicle. For an HT consumer, the point of supply is the outgoing terminals of the utility's metering cubicle (MERC Supply Code 2021). MSEDCL's specification places this cubicle "in between the incoming supply point and the Distribution transformer of consumer's installation", with CTs, PTs and separate compartments for the meter and cable terminations.

  2. HT incomer. At 11 kV and above, the consumer's main control must be "a circuit breaker by consumers" (CEA regulation 37(2)), placed close to the point of supply and able to isolate the whole installation.

  3. Transformer primary protection. A fused switch or circuit breaker is allowed on the primary, but "for transformer having capacity of 1000 kVA and above, a circuit breaker shall be provided" (regulation 37(3)(i)).

  4. Transformer secondary. A circuit breaker of adequate rating goes on the secondary side of every transformer (regulation 37(3)(ii)).

  5. LT main panel (PCC). The power control centre takes the transformer output through an incomer ACB and feeds MCCs, APFC panels and distribution boards.

  6. Distribution and motors. Every distinct circuit needs a fuse or circuit breaker of adequate breaking capacity (regulation 37(4)), and each motor a linked switch or breaker adjacent to it (regulation 37(5)).


Where a DG set and the transformer feed the same LT panel, regulation 47(1)(iii) requires the two incoming breakers to be interlocked so the sources cannot run in parallel by accident.


Which standards apply to HT and LT panels, and which are withdrawn


HT panels are type-tested to IS/IEC 62271-200:2021, the metal-enclosed switchgear standard for 1 kV to 52 kV, with circuit breakers to IS/IEC 62271-100:2021. Ring main units add IS/IEC 62271-103 (switches) and 62271-105 (switch-fuse combinations). LT panels follow IS/IEC 61439-1:2020 (general rules) and IS/IEC 61439-2:2020 (power switchgear assemblies), with ACBs and MCCBs to IS/IEC 60947-2:2016.


BIS lists several older standards as withdrawn or superseded: IS 3427:1997 (HT metal-enclosed switchgear), IS 13118:1991 (HV circuit breakers), IS 8623 Parts 1 to 3 (LV assemblies) and IS 13947 (Part 2) (LV breakers). They still appear in tenders: MSEDCL's 2019 metering cubicle specification cites IS 3427. When a specification names a withdrawn standard, ask the panel builder for type test reports to the current IS/IEC number.


IS/IEC 61439-2 applies whether a panel is a one-off or made in quantity, and the assembly can be done by someone other than the original manufacturer. Siemens' planning manual summarises the two checks the standard demands: design verification by the original designer, and routine verification by the switchboard builder on every panel before delivery.


Typical HT and LT panel ratings


The examples below are from Siemens product documents and show the range each panel class covers.


Equipment

Rated voltage

Current and fault rating

Air-insulated VCB panel (Siemens NXAirS)

Up to 12 kV

Up to 5,000 A, 40 kA for 4 s, internal arc class IAC A FLR

Gas-insulated circuit-breaker panel (Siemens NXPLUS)

12 to 40.5 kV

1,250 A feeders, 31.5 kA for 3 s

SF6 ring main unit (Siemens 8DJH Compact)

Up to 24 kV

400 or 630 A ring feeders, 20 kA for 3 s

Air circuit breaker (Siemens 3WA)

Up to 1,150 V AC

630 A to 6,300 A, breaking capacity 55 to 150 kA at 500 V AC

LV switchboard (Siemens SIVACON S8plus)

Up to 1,000 V

Main busbars up to 7,010 A, short-time withstand up to 150 kA


RMU or VCB panel at the 11 kV incomer


A ring main unit is a compact, sealed switchgear unit for secondary distribution. Siemens describes the 8DJH as "used in public and industrial energy systems of the secondary distribution level", with three-position switch-disconnectors and switch-fuse combinations for transformer protection, filled with SF6 "for the entire service life". A VCB panel is built around vacuum circuit breakers and is rated for higher currents and fault levels: the Siemens examples above start at 1,250 A and run from 31.5 to 40 kA.


CEA regulation 37 narrows the choice. A switch-fuse transformer feeder is acceptable on a transformer below 1000 kVA. At 1000 kVA and above, the transformer primary needs a circuit breaker, which means either an RMU with a breaker feeder or a VCB panel. Regulation 37(2) also requires the consumer's main control at 11 kV and above to be a circuit breaker, so confirm with the Electrical Inspector that the proposed RMU arrangement meets it before ordering. The 33/11 kV substation guide covers the same choice for larger plants.


CEA 2023 safety rules for HT panels above 650 V


Chapter VI of the CEA regulations 2023 adds duties that do not apply to an LT-only installation:


  • Interlocks (regulation 47(1)): isolators cannot be operated unless the breaker is open, earthing switches cannot close unless the isolator is open, and doors to live parts cannot open until the parts are dead.

  • Protection (regulation 47(2)): over-current and earth fault protection on every circuit; Buchholz relay, pressure relief device and winding and oil temperature protection on transformers of 1000 kVA and above; differential protection on transformers of 10 MVA and above.

  • Oil and fire (regulation 46(2)): no substation with more than 2,000 litres of oil in a basement without proper drainage; fire barrier walls and soak pits for larger oil volumes; only dry-type transformers inside residential and commercial buildings; automatic fire fighting on transformers of 10 MVA and above.

  • Earthing (regulation 50): substation equipment bonded to an earth mat that limits touch and step potential, transformer neutrals earthed by two separate connections, and every earthing system tested on a dry day at least once a year.


One rule applies to both panel types above 250 V: a clear space of at least one metre in front of the switchboard (regulation 39(iii)).


Tests before an HT panel is charged


An HT panel needs site tests before it is charged, on top of the factory test certificates. CEA regulation 48(2) says no new apparatus above 650 V "shall be commissioned unless such apparatus, cable or supply line are subjected to site tests as per relevant standards", and regulation 48(6) requires the records to be kept for comparison with later tests.


At the factory, the routine tests listed in IS/IEC 62271-200 are: a dielectric test on the main circuit, tests on auxiliary and control circuits, main-circuit resistance measurement, mechanical operation tests, partial discharge measurement and, for gas-filled compartments, tightness and pressure tests. The standard also includes tests after erection on site. LT assemblies get routine verification under IS/IEC 61439-1: clearances and creepage distances, protective circuit continuity, wiring and function, mechanical operation and dielectric properties.


On site, MSEDCL's test format for installations above 650 V lists these checks for a circuit breaker: IR values in open and closed condition, contact resistance, local and remote operation, interlocks with the isolator and earth switch, and the trip functions of the earth fault, over-current and transformer protection relays. MSEDCL's metering cubicle specification sets the one-minute power-frequency withstand test at 28 kV, 50 kV and 70 kV for 11 kV, 22 kV and 33 kV equipment.


Who approves an HT panel installation


Above the state's notified voltage, the Electrical Inspector must inspect, test and approve the installation in writing before supply starts (CEA regulation 45(3) and (4)). At or below it, the owner self-certifies and files the report, which counts as received if the inspector does not acknowledge it within three working days (regulation 45(1)).


The notified voltage differs by state. Maharashtra declared 11 kV in a Government Resolution of 19 July 2019, so an 11 kV factory installation there is self-certified and a 22 kV or 33 kV one needs the inspector. Delhi notified 33 kV for self-certification through Electrical Safety Engineers in January 2017. Both were issued under the 2010 regulations, so confirm the current position with the state's electrical inspectorate before planning the schedule. The CEA 2023 guide for factories explains the inspection form in detail.


HT and LT panel questions


What is the difference between an HT panel and an LT panel?


An HT (high tension) panel switches and protects the 11, 22 or 33 kV incoming supply ahead of the transformer, using vacuum or SF6 breakers built to IS/IEC 62271. An LT (low tension) panel distributes the transformer's 415 V output through ACBs and MCCBs, in an assembly built to IS/IEC 61439.


Is an 11 kV panel high voltage or medium voltage?


Both labels are in use. IS/IEC 62271-200 is titled a high-voltage switchgear standard and covers above 1 kV up to 52 kV, and the Maharashtra supply code calls 11 kV high tension. Siemens sells the same class of equipment as medium-voltage switchgear.


What is the voltage of an HT panel?


In Indian factories an HT panel usually works at 11 kV, 22 kV or 33 kV, using equipment rated 12 kV, 24 kV or 36 kV. Legally, in Maharashtra, anything from 650 V up to 33,000 V is HT.


Is a 690 V panel HT or LT?


Under the Maharashtra supply code and the CEA's above-650 V rules it is HT, so the stricter safety rules apply. The panel itself is still designed and tested as a low-voltage assembly under IS/IEC 61439, which covers up to 1,000 V AC.


Can an RMU replace an HT panel?


Partly. A switch-fuse feeder is allowed on the primary of a transformer below 1000 kVA, but at 11 kV and above the consumer's main control must still be a circuit breaker (CEA regulation 37(2)). From 1000 kVA, the CEA regulations require a circuit breaker on the transformer primary, so the RMU needs a breaker feeder or the plant needs a VCB panel.


What does Form 4b mean on an LT panel?


It is the last of the forms of internal separation in IS/IEC 61439-2, as Siemens' planning manual summarises them. Busbars, each functional unit and the outgoing terminals of each unit are all separated from one another, and in 4b the terminals sit in a separate compartment from their own functional unit.


Which standard replaced IS 8623 for LT panels?


IS/IEC 61439-1 and 61439-2 (2020 editions). BIS lists IS 8623 Parts 1 to 3 as withdrawn.


How Grade Electricals works with HT and LT panels


Disclosure: Grade Electricals sells this work and does not manufacture panels. Its turnkey projects page describes installing "electrical equipment and panels according to Indian Standards and OEM manuals", grouting panels at floor level so they do not shift during a short circuit, and earthing each piece of equipment at distinct points, on LV and HV projects up to 33 kV. Its maintenance page lists preventive maintenance of RMUs up to 22 kV, vacuum and SF6 breakers up to 33 kV, ACB and MCCB LT panels and protection relays, with switchgear IR and HV tests, breaker contact resistance and timing tests, panel interlocking checks and relay primary and secondary injection. For a panel installation or shutdown, contact Grade through the contact page.


Sources


Sources checked on 19 November 2026: MERC Supply Code 2021; CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, Gazette copy hosted by KSEB; MSEDCL metering cubicle specification; MSEDCL notified voltage circular; Delhi notified voltage notification; BIS programmes of work for HV switchgear (ETD 8) and LV switchgear (ETD 7); IEC webstore pages for IEC 62271-200 and IEC 61439-2; Siemens documents for NXAirS, NXPLUS, 8DJH Compact, 3WA and SIVACON S8plus. Supply code limits can change by amendment; this page is reviewed monthly.

Recent Posts

See All

Comments


Head Office

Unit No.5, Y.A.Chunawala Indl.Estate, Near Jacob Building, Kondivita Road, J.B.Nagar, Andheri [E], Mumbai- 400 059

+91 22 28366241 / 42

enquiry@gradeelectricals.com

Inquiries

For any inquiries, questions or commendations, please call: +91 22 28366241 / 42

© 2025 by Grade Electricals Pvt. Ltd.

bottom of page